Davyhulme Waste Water treatment Works
Maximising on the potential of our multi-disciplined workforce, we prefabricated a 5.5 metre high support structure at Cariton Works prior to delivering to site and erecting in position. We then positioned our clients free issue screen and centrifuge prior to installing pipework, decking out the structure and then supplying and installing perimeter handrails and access stairways.
Running in tandem with this project further mechanical installation and pipework projects were being carried out by other group divisions including a factory built cylindrical storage tank. The works were successfully carried out with minimal lead times in a climate of continual change as the project developed at site level.
|

|